Mark Shaffer
Architect / Construction Specialist
Alvin Josephy
Project Manager from KMB Design Group
Reduction of the metal roofing budget.
Install waterproofing, sheet metal and ballasted membrane roofs while coordinating with the owner's general contractor and two other general contractors working simultaneously on adjacent buildings.
Adhere to a very short time schedule to enable the opening of the Gateway project for Christmas shopping.
Work safely while installing a roof that sloped 16 inches vertically for every 12 inches horizontally.
| Building Owner: | Galyan's Trading Company |
| General Contractor: | Greenwood Construction |
| Curved Barrel Roof: | 23,000 sq. ft. |
| Manufacturer: | Sarnafil Roofing Systems |
| Product: | 60mil reinforced S327 & Décor Rib. |
| Installation: | Fully Adhered |
Flat Roof Area: |
42,000 sq. ft. |
| Manufacturer: | Carlisle Syntec Inc. |
| Product: | Mirafi Miridri |
| Installation: | 860 rubberized asphalt membrane & drainage panel Fully Adhered |
| Project Completed: | Fall, 2001 |
Galyan's wanted a notable look to attract customers to their first Utah store, but high construction costs were inhibitive. Clarks Quality Roofing proposed that, rather than install a costly metal roof, they install a membrane roofing system with attached membrane battons. This system looks like a curved metal roof, but is half the cost of metal.
Stringent safety standards were adhered to during the project. All workers were fully tied-off during the installation of the steep roof. Clark's Quaility Roofing has a comprehensive safety program and one of the best experience
modifications in the region spoke.
Since Clarks had worked with each general contractor independently on separate projects of equal difficulty, the coordination and communication was very successful.